A community guide to the proposed SpaceX / Tombstone Resources data center. Explore the potential for local employment, cooperative member benefits, water reuse, and wildlife-conscious site design.

Local opportunity. Linked sources. Updated November 7, 2026.

Illustrated southeastern Arizona grasslands and distant rocky mountains
SOUTHEASTERN ARIZONA31° N / 109° W
OUR LANDSCAPE. OUR CONVERSATION.Illustrative regional landscape · not a site rendering
NEXT PUBLIC HEARING

December 9, 2026 / 2:00 p.m. Arizona time

Hearing details

01 / THE PROPOSAL

Explore the
local opportunity.

A quick overview first. Expand a question below for the supporting detail.

COCHISE COUNTY · SU26-22

A proposed computing campus near the Apache Generating Station, along U.S. Highway 191.

Tombstone Resources L.L.C. is the applicant for Special Use docket SU26-22. Its November 4 town hall statement names SpaceX as host. Applicant statement ↗

747 acresApproximate campus area
9 buildingsUp to, across four phases
6 GWEstimated full-build demand

Planning figures from the applicant, summarized by the County. County project page ↗

TWO DIFFERENT PICTURES

While it’s built.
When it’s running.

Applicant planning estimates and design descriptions.
Construction and operations can overlap.

Construction and daily operations at a glance
Topic Construction Daily operations
StaffingThousands of temporary trades workers; about 5,500 at peak construction.About 250 operations staff and contractors initially; about 1,000 across all shifts at full build-out.
TrafficWith the shuttle plan: roughly 80 buses, 1,000–1,300 passenger vehicles, and 150–250 trucks daily. Each enters and leaves once.Roughly 600–700 passenger vehicles per day at full build-out, spread across all hours; deliveries and maintenance also occur.
HoursAround-the-clock construction is proposed, with staggered shifts and worker shuttles.A 24-hour operating campus with technicians, facilities crews, security, and maintenance.
SoundSite work, construction equipment, deliveries, and construction traffic vary with the phase of work.Dry-cooler fans and transformers are the main routine sources described. Standby generators run for outages and testing; buffers and equipment placement are part of the design.
LightingShielded construction lighting is requested for each phase, including night work.Shielded, downward-directed, warm lighting; dimming or motion controls where practical, with task lighting for maintenance.
DurationAbout one to two years from vertical construction to occupancy per phase, with phases overlapping.Ongoing operation as buildings enter service. Later phases can be under construction while earlier buildings operate.

Workforce figures span all shifts; they are not simultaneous site occupancy. Traffic figures are applicant estimates, not measured counts. Source: Operations Narrative, pp. 26–29 ↗

THE LOCATION

Put the proposal
on the map.

U.S. Highway 191 · Apache Generating Station
Cochise County, Arizona

Official Cochise County location map · highlighted parcels are included in the application · not to scale.

Two properties.
One proposed campus.

The application covers approximately 747 acres: roughly 400 acres on the AEPCO property and 348 acres on the Southline property. The approximate acreages are rounded.

The County map shows the relationship to Highway 191, Apache Station, and Willcox Playa. It is a location guide, rather than a construction layout or a property survey.

Open original County map View applicant concept plans
Enlarged official County map of project parcels

County project location map. For surveying or legal boundaries, use the original records.

HOW IT WORKS

Big systems.
Plain explanations.

Server racksHeat exchangerOutdoor dry coolersWarm rack liquidCooled liquid returnsWarm facility liquidCooled liquid returnsHeat released to airRACK LOOPFACILITY LOOPHeat crosses the exchanger. The two liquids stay in their own circuits.

Move heat. Recirculate liquid.

The applicant’s base design uses fans rather than cooling towers to reject heat. Reclaimed water from AEPCO’s Apache Generating Station will be used for the initial cooling-system fill. Potable water will serve workers’ everyday needs, including drinking water, handwashing, and bathrooms. The application also identifies trucked non-potable water as a backup supply. The Water Narrative also discusses optional spray assistance during exceptional heat.

Read the applicant’s technical narrative

Simplified educational diagrams based on the application. These are not engineering drawings or a detailed electrical one-line.

WHAT THIS COULD MEAN LOCALLY

Explore the applicant’s design commitments and the utilities’ proposed member benefits in the linked sources.

02 / BENEFITS & DESIGN

The opportunity,
in detail.

Choose a topic, then expand a question.
Read the proposal and its supporting sources.

Less water. More reuse.

Potable water will serve workers’ everyday needs, including drinking water, handwashing, and bathrooms. Reclaimed water from AEPCO’s Apache Generating Station will be used for the initial cooling-system fill. Explore the dry-cooling design, water reuse, and stormwater infiltration below.

Read the water narrative
01How does annual water use compare with pecan trees?
APPLICANT ESTIMATE · PECAN COMPARISON

At full build-out, estimated operational use is 7–10 acre-feet per year, excluding construction: about the annual irrigation applied to 1.75–2.5 acres of mature pecan trees. This comparison uses the University of Arizona’s 2026 planning assumption of 4 acre-feet per acre per year; actual orchard use varies. An optional heat-wave spray reserve could add up to 4 acre-feet a year, equivalent to another 1 acre of mature pecans annually. These are volume comparisons, not a claim that the project replaces an orchard or has the same groundwater impact.

University of Arizona · Pecan irrigation benchmark
02Which water will be used where?
POTABLE WATER & RECLAIMED WATER

Potable water will be used for workers’ normal daily needs, including drinking water, handwashing, and bathrooms. Reclaimed water from AEPCO’s Apache Generating Station will be used for the initial cooling-system fill. The reclamation plan intercepts and treats a portion of the station’s wastewater that would otherwise enter evaporation ponds. The application also identifies reclaimed water for construction and fire reserves, with trucked non-potable water as backup. The one-time fill across the full campus is estimated at 10–18 acre-feet over the multi-year build-out: the same volume used to irrigate about 2.5–4.5 acres of mature pecans for one year at the University of Arizona benchmark. This one-time cooling-loop fill is separate from annual operations.

Application · Water Narrative, pp. 31–33
03How does dry cooling work in hot weather?
APPLICANT PROPOSAL

Liquid circulates inside closed pipes while outdoor fans carry heat away, much like a car radiator. The base design avoids evaporating water for routine cooling. During exceptional heat, the proposal allows the loop temperature to rise within equipment limits; the narrative also describes an optional reserve spray capability.

Application · Dry-cooling design
04What does the application say about groundwater recharge?
STORMWATER INFILTRATION & RECHARGE

The application identifies a stormwater retention basin and preserved natural washes to promote on-site infiltration and recharge. Its drainage plan also calls for managing runoff without increasing discharge to neighboring properties, with basins draining within 24 hours. Reclamation means treating and reusing wastewater; recharge means water moving into the ground to replenish groundwater. The application does not give a quantified aquifer-recharge volume or describe a dedicated aquifer-injection project.

Application · Water strategies; Operations Narrative, section 13

03 / TAX DISTRICTS

Where could
tax revenue go?

New taxable investment could benefit County services, Cochise College, the applicable school district, and hospital, library, and flood control districts. Parcel boundaries and tax rules determine each entity’s share.

County tax information

POTENTIAL TAX DISTRICTS BENEFITING

What property-tax revenue does the applicant project?
$34M–$103Mannual property-tax projection

The application’s summary gives this overall range. It does not provide a district-by-district dollar allocation. This is an applicant projection, rather than a verified amount for any one entity’s budget. Parcel coverage, assessed value, tax treatment, levies, and school funding rules determine the district effects.

Applicant financial summary
01

Cochise County

County government and services.

02

Cochise County Junior College District

Cochise College.

03

Cochise Elementary School District #26

The local elementary district identified for the project area; parcel coverage and school funding rules determine the net benefit.

04

Northern Cochise Hospital District

Supports local hospital services, with project parcels within the district eligible to contribute through its property-tax levy.

05

Cochise County Library District

Countywide library services supported by the library property-tax levy.

06

Cochise County Flood Control District

Flood control and drainage programs supported by the countywide flood control levy.

What about “Type 03 Cochise”?

The County lists Cochise Elementary Type 03 as a separate school-related levy. This school-related levy follows the applicable tax and school-funding rules.

Potential benefits grow with completed taxable development. Parcel coverage, valuation, and funding rules determine each district’s share.

FROM APPLICATION TO OPERATION

The sequence,
at a glance.

Recorded dates, a scheduled hearing,
and the applicant’s construction outlook.

01Application receivedCOUNTY RECORD

SU26-22 submitted to Cochise County.

View source
02Applicant town hallAPPLICANT EVENT

The applicant’s statement names SpaceX as host.

View source
03Public hearingSCHEDULED · 2 P.M. AZ

Planning & Zoning Commission hearing in Bisbee. Check the official notice for changes.

View source
04Designs, permits & utility workREQUIRED SEQUENCE

Building and agency permits, utility studies and facilities, and applicable approvals precede service and occupancy.

View source
05Construction service targetAPPLICANT TARGET

The application narrative mentions March; the utility letter identifies April. This guide uses spring 2027 as the target window, rather than a confirmed start date.

View source
06Build and occupy in stagesAPPLICANT ESTIMATE

The Operations Narrative estimates one to two years from vertical construction to occupancy for each phase, with overlap. It gives no fixed completion date for the whole campus.

View source

The permitting step is a prerequisite, not a dated milestone. Later construction phases depend on the required infrastructure and approvals.

WHO HANDLES WHAT

The right question.
The right place.

Expand an entry for responsibilities
and official contact links.

01PROJECT PLANSTombstone Resources / applicant

Project design, phasing, proposed operations, and the applicant’s commitments. Tombstone Resources’ town hall statement identifies SpaceX as host.

02LAND USE & COUNTY REVIEWCochise County Development Services

Coordinates the Special Use review and relevant County and agency reviews. The Planning & Zoning Commission decides the application, with an appeal route to the Board of Supervisors. Use docket SU26-22 when asking about this proposal.

03ELECTRIC SERVICESSVEC & AEPCO

SSVEC is the retail electric-service cooperative. AEPCO handles wholesale power and the transmission and substation arrangements described for the project. Questions about utility studies, service infrastructure, member benefits, and cost assignments belong with the utilities.

04UTILITY REGULATIONArizona Corporation Commission

Reviews utility service arrangements within its authority. SSVEC identifies Commission approval as part of the project’s Energy Services Agreement process. The Commission’s large-load framework and eDocket are useful sources for agreement requirements and filings.

05GROUNDWATER & WELLSArizona Department of Water Resources

Groundwater rights, wells, and Active Management Area requirements. The Willcox AMA page is the official starting point for area-specific groundwater rules and AMA staff contacts.

06ENVIRONMENTAL QUALITYArizona Department of Environmental Quality

Air quality, water quality, wastewater, and waste requirements within ADEQ’s authority. Which permits apply depends on the facility and its proposed activities. Groundwater-use rights and groundwater-quality protection are different responsibilities.

07HIGHWAY ACCESSArizona Department of Transportation

State highway right-of-way and encroachment permits, including proposed Highway 191 driveway connections. The application also identifies ADOT review of the traffic impact analysis and required highway access improvements.

Public contact sources checked November 7, 2026. These links open the organization’s own website, email address, or phone number; this guide does not submit inquiries.

04 / GO TO THE SOURCE

The documents
behind the discussion.

PROJECT RECORD

Dates to know.

Manually maintained · reviewed November 7, 2026

Public hearing scheduled

2:00 p.m. Arizona time in Bisbee. Check for schedule changes.
Official legal notice ↗

Applicant town hall

The applicant’s dated statement names SpaceX as host.
Read the applicant statement ↗

Application received

The County announced receipt of the Special Use application.
County announcement ↗

This guide is a dated snapshot. Source pages may be updated at different times; use the County’s current notices for hearing information.

05 / PUBLIC HEARING

Follow the
public review.

The County lists a hearing for docket SU26-22 on December 9. Confirm the schedule and attendance information on the official County page.

Official hearing information

PLAIN-LANGUAGE GLOSSARY

A few terms.
A clearer picture.

Acre-foot (AF)Water

A volume of water equal to covering one acre of land one foot deep: about 325,851 U.S. gallons. Acre-feet per year describes an annual volume; a one-time cooling-loop fill is a separate quantity.

USGS water glossary
Gigawatt (GW)Power

A unit of power: one billion watts, or 1,000 megawatts. It describes the rate of electricity use or production at a moment. The proposal’s roughly 6 GW full-build figure describes electrical demand, rather than energy used over a year.

EIA · Measuring electricity
Gigawatt-hour (GWh)Power

A unit of energy. Using 1 GW steadily for one hour uses 1 GWh. A battery’s GWh rating describes energy storage; its GW rating describes how quickly it can deliver power. They measure different things.

EIA · Measuring electricity
Battery Energy Storage System (BESS)Power

Batteries and associated equipment that store electrical energy and deliver it when needed. This proposal describes on-site storage to carry computing loads through grid disturbances. Storage must be charged; it is not a source of newly generated energy.

Application · Operations Narrative
Dry coolingWater

A way to release heat through air-cooled heat exchangers and fans. The applicant’s base design avoids cooling towers and routine evaporative cooling. Its narrative separately discusses optional spray assistance during exceptional heat.

Application · Water Narrative
Closed-loop coolingWater

Cooling liquid circulates through a contained circuit and is reused. Heat is transferred out while the liquid returns through the loop. An initial fill and small maintenance makeup quantities are separate from continuously evaporating cooling water.

Application · Water Narrative
Water reclamation / reuseWater

Treating previously used water so it can serve another suitable use. The application proposes treated Apache Station wastewater for non-potable needs. Reuse describes using that water again; it does not itself mean the water is returned to the aquifer.

USGS · Reclaimed wastewater terminology
Groundwater rechargeWater

Water reaching and replenishing groundwater storage. Stormwater infiltration can contribute to recharge, but a drainage basin’s size or captured runoff alone does not establish the volume that reaches the aquifer. The application discusses preserved washes and infiltration; it gives no quantified recharge volume.

USGS · Recharge definition
Special Use AuthorizationPlanning

The County’s land-use review for this proposed use. It is separate from a building permit. The Planning & Zoning Commission considers the request, and applicable permits and other approvals are part of the development process.

County · Special Use process

Definitions are simplified for this guide. Linked sources provide the technical context.

A FEW IMPORTANT DISTINCTIONS

Is this an official SpaceX or County website?

No. This is an independent community information guide. It does not speak for SpaceX, Tombstone Resources, Cochise County, SSVEC, or any taxing district.

Are the tax districts guaranteed additional spending money?

The applicant provides an overall tax projection, but that does not establish a net budget benefit for each district. Parcel coverage, valuation, tax treatment, applicable levies, and school funding formulas determine each entity’s budget effect.